MP-119  /  Example project  /  Commercial

Office Cat B fit-out

An open-plan floor turned into a working office: meeting rooms, a kitchen and breakout space, new lighting and power to the desks, delivered with the rest of the building occupied.

Sector
Commercial
Location
London
Type
Example project

Illustration of two construction operatives in hi-vis walking down a narrow City of London street

MP-050 / Brief

The brief

A Category A shell floor in a multi-let building, with a tenant who needed meeting rooms, a kitchen and power to every desk by a fixed move-in date.

A typical fit-out runs alongside other tenants, so deliveries, noisy work and the shared lifts are booked with the building manager, and the programme is built around those slots.

Work like this starts with a measured survey and an itemised quotation.

MP-051 / Scope

What we delivered

  • Glazed and solid meeting rooms in metal stud partitions, with acoustic insulation and door sets.
  • Tea point and kitchen with services connected to the building risers.
  • Small power and data to every desk position through floor boxes in the raised floor.
  • Lighting adapted to the new layout, with controls and emergency lighting.
  • Ceilings, flooring and decoration throughout the floor.
  • Fire alarm and sprinkler heads adjusted to the new rooms and certificated at handover.

MP-052 / Challenges

Three problems we plan for

01 / Occupied building

Other tenants stay in business while we work

Noisy work, deliveries and the goods lift are booked with the building manager, and the floor is sealed so dust stays on our side.

Noisy work kept to agreed hours.

02 / Landlord

The landlord approves the design before work starts

Drawings, method statements and any changes to building services go through the landlord's surveyor in time to keep the start date.

Approvals tracked against the programme.

03 / Move-in date

The tenant's move-in date does not move

Long-lead items such as glazing and door sets are ordered at contract, and the programme is built backwards from handover.

Long-lead items ordered at contract.

Illustration of a Category B office fit-out
Illustration · Open-plan floor, fitted out

MP-053 / Outcome

Ready for the first working day

The aim is a floor the tenant can move into on the agreed date, with services commissioned, certificates issued and a 12-month defects period.

MP-054 / Next step

Have an office floor to fit out?

Send us the floor plan and the move-in date, and we will tell you what the programme needs before we quote.