Plant room heating & water services
A plant room fitted out from bare walls: hot water cylinders, a cold water storage tank with a booster set, heating circuits and a three-phase electrical supply, all insulated, labelled and tested.
- Sector
- Commercial
- Location
- London
MP-050 / Brief
The brief
The building needed its heating, hot water and cold water services brought into one plant room, with a supply big enough to run them.
Plant rooms are tight, and everything in them needs to be reached again for servicing. Pipe routes were set out on the wall before installation, so valves, pumps and meters sit where an engineer can get to them.
MP-051 / Scope
What we delivered
- Unvented stainless steel hot water cylinders installed with expansion vessels and safety controls.
- Cold water storage tank with a twin-pump booster set and accumulator vessel.
- Heating circuits through a low-loss header, with pumps, strainers and isolating valves.
- All pipework insulated and identified with service and flow-direction labels.
- Three-phase supply with a rotary isolator, new distribution boards and heating controls.
- Circuits labelled, tested and handed over with the room finished and clean.
MP-053 / Outcome
Built to be serviced
The plant room was handed over with every service labelled and every circuit tested, so it can be maintained without tracing pipes back by hand.