MP-131  /  Commercial

Plant room heating & water services

A plant room fitted out from bare walls: hot water cylinders, a cold water storage tank with a booster set, heating circuits and a three-phase electrical supply, all insulated, labelled and tested.

Sector
Commercial
Location
London

Completed plant room with hot water cylinder, cold water tank and labelled pipework

MP-050 / Brief

The brief

The building needed its heating, hot water and cold water services brought into one plant room, with a supply big enough to run them.

Plant rooms are tight, and everything in them needs to be reached again for servicing. Pipe routes were set out on the wall before installation, so valves, pumps and meters sit where an engineer can get to them.

MP-051 / Scope

What we delivered

  • Unvented stainless steel hot water cylinders installed with expansion vessels and safety controls.
  • Cold water storage tank with a twin-pump booster set and accumulator vessel.
  • Heating circuits through a low-loss header, with pumps, strainers and isolating valves.
  • All pipework insulated and identified with service and flow-direction labels.
  • Three-phase supply with a rotary isolator, new distribution boards and heating controls.
  • Circuits labelled, tested and handed over with the room finished and clean.
Hot water cylinder beside a low-loss header and pump set
Cylinder, low-loss header and pumps
Unvented hot water cylinder with insulated copper connections
Unvented cylinder connections
Open three-phase distribution board with neatly dressed cabling
Distribution board, wired and labelled
Twin-pump booster set with an accumulator vessel in front of the water tank
Cold water booster set
Rotary isolator, expansion vessels and valve sets on the plant room wall
Isolator, vessels and valve sets
Insulated pipework with service identification bands around the cylinder
Pipework insulated and identified
Cold water storage tank with insulated pipework above it
Cold water storage tank
Distribution board, isolator and controls mounted on the plant room wall
Supply, isolator and controls

MP-053 / Outcome

Built to be serviced

The plant room was handed over with every service labelled and every circuit tested, so it can be maintained without tracing pipes back by hand.

MP-054 / Next step

Have a plant room to replace or upgrade?

Tell us what the building runs and what is there now, and we will set out the work and the shutdowns it needs.